National Academy of Science and Technology
(Faculty of Science and Technology)
Dhangadhi Engineering College
Dhangadhi, Kailali, Nepal
A
Project Report on
Super Game
SUBMITTED TO:
Dhangadhi Engineering Collage
For the partial fulfillment of requirements for the degree of BCA
Under Pokhara University
SUBMITTED BY
Paawan Prashad Bhatt
BCA(2nd)
2070/08/13
Introduction
In these days, there
are many games which are being played on computers because of many reasons such
as for ease, to increase thinking capacity and for entertainment. My game Super
Game is such a beautiful game which is made by using C
Language which is highly surprising and interesting. It
uses the arrangement of letters of alphabets to display the word thought by
player by giving some information about the word.
Problem statement
The other games are bulky, time consuming, unwinnable, can contain
virus, can damage system hardware, update message displaying, and requires
internet connection to download; so they are costly and boring. This game is
made to overcome all these problems and to serve the player short and sweet
pleasure of playing game.
Objectives
Each and every thing that are available in the world has its own
objectives. Similar to the way this game also has some objectives. The
main objective of this game is to provide complete, easy and surprising
entertainment of playing game. All in all I can sure you that this is error
free, effective and entertaining.
The objectives of my game are as follows.
To give the player surprising entertainment
To give the player knowledge about combination of
alphabets
To make the player familiar with alphabets
To save memory
To provide short and sweet pleasure of playing game
Methodology
I have used the simplest model to make this game. The following
steps are involved while developing the Super Game.
1. Requirement
analysis
All the necessary requirements are specified in this game by
displaying the message of requirements. We have collected all the requirements
and have tried to fulfill the maximum requirements of the players.
2. Requirement
specification
After the study of books data were collected all the hardware and
software requirements were collected by me for the easiness to fulfill the
maximum requirements of this game.
3. Feasibility
Study
The purpose of this phase is to produce feasibility study document
that evaluated the cost and benefits of the purposed application. The
feasibility study tries to change future scenarios of a software development.
In the feasibility we have deeply studied about the six steps of the
feasibility. They are as follow:
a) Technical
feasibility
Hardware and software parts related feasibility is refers as
technical feasibility. For this program it needs following hardware and
software components.
Hardware
Requirements
· 128MB or more RAM
· 40 GB hard disk
· 1.6GHZ processor
· Functional
keyboard and mouse
· Backup media like
pen drive, CD-R/CD-RW
Software
Requirements
· Windows Operating
System(7/8)
· C programming
software for coding
· Ms PowerPoint for
slide show
· Ms Word for
documentation
b) Economical
Feasibility
It is the feasibility related to cost. It analyzes the cost during
program development. It also analyzes how the system is beneficial for the user
and producer. The estimated cost for this program is given below. The costs
involved and expected selling price of this system is given below:
Project development cost
=500
Operating
cost
=300
Selling price of this system is Rs.
=1000
c) Schedule
feasibility
Project Gantt Chart
The following chart shows the time taken by the different steps
while developing our project.
S.N
|
Jobs
|
No. of Days
|
|||||||
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
||
1
|
Fund
Collection
|
||||||||
2
|
Problem
Identification
|
||||||||
3
|
Requirement
Analysis
|
||||||||
4
|
User
Interface
|
||||||||
5
|
Program
Design
|
||||||||
6
|
Coding
|
||||||||
7
|
Testing
and Debugging
|
||||||||
8
|
Final
Project
|
4. Design
And Specification
Once I have documented the Requirements for the system, I have
designed this game to meet them.
5. Coding
and testing
For coding the problems and requirements of the project we have
used a programming language called C.
6. Integration
and System Testing
All the module that have been developed and tested
individually are put together (integrated) and are tested as a whole system.
7. Delivery
I have delivered the game to the interested players.
Deliverables
At the end of this project
we will submit
- Soft
copy of our project or the executable ( .exe ) file in Pendrive
- Hard
copy of the report.
References
1. Let us C
2. Internet
3. Parents
4. Friends and Teachers
No comments:
Post a Comment